Remote Quantity Surveying & Construction Estimating
I offer remote quantity surveying services. You provide me with architectural and structural information and I will return with takeoffs, estimated materials required and a BOQ. I can also prepare tender documentation. If you have a good BIM model, I will extract 5D quantities from that also. All quantities given should be easily verifiable from the drawings, on a line by line basis.
Remote Quantity Takeoffs, BOQs & Construction Estimates
I can take quantities from your architectural and structural drawings. I will provide you with quantity surveying reports and a BOQ. These can be used to price up and plan.
What I Do
I've spent time on site and I've spent time in the estimating office, and I use both when I measure. Look through my background, my services, the sample BOQ formats and some takeoff and BIM outputs to see how I work.
Professional Experience
Office QS Engineer & Site Engineer | Private Building Contractor
March 2023 – April 2026 · 3 Years Full-TimeI worked as both a quantity surveyor and a site engineer on G+4 to G+6 residential and commercial buildings. Part of my time went to estimating and the rest to running things on site.
- Produced quantity surveys, estimates and BOQs from design information. Worked using Revit/IFC models and 5D BIM quantity processes for these G+4 up to G+6 buildings.
- Created baseline schedules in MS Project.
- Managed the day-to-day activities on site, including labour coordination and monitoring quality of works carried out.
- Wrote regular progress reports (physical and financial).
Having worked in both quantity surveying and site engineering roles, I consider how something will be practically constructed during the estimating process. This can be seen in the quantity values.
Shelter Officer | Development Expertise Center (DEC)
UNHCR Partner Program- Responsible for the design and planning of the shelter solution in an emergency situation. Responsible for managing field teams. Ensured that deliverables matched the scope of work. In charge of takeoffs, BOQs and tender documents.
- Constructed quick relief structures within short timeframes, using timber and waterproof tarpaulin or plastic sheeting.
- Monitored the materials used on site to ensure the correct amounts were used.
Infrastructure Engineer | Lowland Livelihood Resilience Project (LLRP)
District Operations Specialist- Prepared detailed quantity takeoffs, Bills of Quantities and material quantities from project drawings for various infrastructure projects under each woreda (district).
- Helped build and supervise rural infrastructure works in a few districts, comparing the site work with the designs and project requirements. Also prepared the tender documents.
Mobile Support Team (MST) Engineer | Pastoral Community Development Project (PCDP)
Worked across 4 woredas.Supervised community projects including new primary schools, community clinics, gravel roads and water supply systems. Work carried out from planning to handover. Also covered quantity surveying, Bills of Quantities and tender documentation.
Remote Estimating Services
2D PDF Material Takeoffs
- Checking and setting the drawing scale before I measure anything.
- Measuring concrete for slabs, columns, foundations and similar elements.
- Working out areas for blockwork, plastering and external finishes.
Bill of Quantities (BOQ) Setup
- Measured items go under clear trade headings.
- Every BOQ item gets a number, a unit and a short description.
- You get an Excel file you can edit, price and keep using.
Rebar & Bar Bending Schedules (BBS)
A Bar Bending Schedule needs enough reinforcement detail on the structural drawings. When it's there, I list the bar marks, diameters, shapes, cutting lengths and total steel. I send it in Excel, so you can check it, plan fabrication or ask suppliers for prices.
5D BIM Quantity Takeoffs
If your IFC model is detailed enough, I take the volumes, areas and element counts out of it and put them in a CSV or Excel schedule. You review it from there.
Subcontractor Trade Takeoffs
Quantity schedules for one trade at a time, such as drywall partitions, certain MEP elements or reinforcement, so you can tender or price a subcontract.
Insurance Repair BOQs
Repair estimates broken down item by item, from whatever you can give me: site photos, damage reports, drawings or models. The more detail you send, the more complete the estimate gets.
Service Pricing & Work Description
| Building Category / Scale | Full Bill of Quantities (BoQ) & Takeoff | Structural Takeoff OnlyConcrete & Rebar | Architectural Finishing Takeoff OnlyFinishing Works |
|---|---|---|---|
| G+2 to G+4Low-Rise Residential / Villa / Commercial | $350 – $650 | $200 – $350 | $150 – $250 |
| G+5 to G+8Mid-Rise Apartment / Office Building | $700 – $1,200 | $400 – $650 | $300 – $500 |
| G+9 to G+12High-Rise Commercial / Residential | $1,300 – $2,200 | $750 – $1,200 | $500 – $850 |
| G+13 to G+20Major High-Rise / Mixed-Use Towers | $2,300 – $4,500+ | $1,300 – $2,400 | $900 – $1,800 |
Wood-Frame House (USA) - Pricing
| Project Size | Framing / Lumber Only | Full House BOQFull House Takeoff |
|---|---|---|
| Small HomeUnder 1,500 ft² (140 m²) | $120 – $220avg. $170 | $250 – $450avg. $350 |
| Medium / Custom Home1,500 – 3,500 ft² (140 – 325 m²) | $220 – $400avg. $310 | $450 – $850avg. $650 |
| Large Home / Townhouse (Multi-Family)Over 3,500 ft² (325 m²) | $400 – $750+avg. $575 | $850 – $1,600+avg. $1,225 |
All prices are in US dollars, shown as a range with a typical average. Floor area, how complicated the plans are and the number of sheets all move the final quote. There's a CSI-2 Wood Frame sample under Takeoff Samples if you want to see one.
Specialized Services: Pricing by Project Scope
| Service & Work Description | Small Scope | Medium Scope | Large / Complex |
|---|---|---|---|
| 5D BIM Quantity Takeoffs.IFC to CSV/Excel: volumes, areas and item counts taken from your .IFC files | $150 – $300Average: $225 | $350 – $750Average: $550 | $800 – $2,000+Average: $1,400 |
| Subcontractor Trade TakeoffsDrywall, MEP, rebar: material lists for one trade, ready for your bid | $100 – $250Average: $175 | $250 – $550Average: $400 | $600 – $1,400+Average: $1,000 |
| Insurance Repair BOQsClaim and damage estimates: itemized repair costs from photos, reports or models | $120 – $250Average: $185 | $250 – $600Average: $425 | $650 – $1,500+Average: $1,075 |
Rebar & Bar Bending Schedules (BBS): Price List
| Typical Work / Complexity | Estimated Price | What’s Included |
|---|---|---|
| Small ScopeSingle elements (footings, columns, beams, walls) or small residential packages | $75 – $180 | Bar marks, cut lengths, bend shapes, and total weight in Excel |
| Medium ScopeMulti-story slabs, framing zones, or mid-size commercial / residential sets | $250 – $650+ | Member-by-member schedules, lap / hook allowances, and a procurement summary |
| Large / ComplexFull building packages, complex or heavy layouts, or ongoing revisions | $800 – $2,000+ | Full BBS package, drawing revision updates, and priority turnaround |
Small scope is one type of structural element, or one small section. Think only footings, only columns, only beams, or a small residential item. It's not a whole building. Medium scope is several elements together, like footings, columns and beams or slabs for one section, or a mid-size residential or commercial project.
SPECIAL OFFER
I want you to feel sure about the accuracy and quality of my work before you commit to anything. So when you place your first order with me, I'll do it for half the price shown in the pricing tables above. The offer applies to projects priced at $600 or more in the tables. If you have a different arrangement in mind, I'm open to discussing it. I'll confirm the terms in writing before I start.
How It Works
1Send Your Drawings
Email your architectural and structural drawings as PDFs, or an IFC model if you have a suitable one, to belayamba1984@gmail.com. Files too big for email? Upload them to Google Drive or Dropbox, click Share, set access to "Anyone with the link", then copy the link and email it to me. If the link isn't set to "Anyone with the link", I won't be able to open it. Tell me where the project is, what the scope is and any specifications I should know about.
2Review & Quote
I go through what you sent and look at the scope, how many sheets there are and how complicated the job is. Then I email you a price and a delivery time I can stick to. If anything's unclear, I'll ask you before I quote.
3Agree & Sign
When we agree on the price and delivery time, I email you the service agreement. You read it and we both sign electronically. I start as soon as the signed copy is back with me.
4Receive Deliverables
You get the deliverables we agreed on, in the formats written in the quotation. That's normally Excel and/or PDF. If revision rounds are included, the scope will say so.
Before we start: please send your company profile and a LinkedIn page for your business along with your drawings. I work with clients in other countries, so this is simply how I confirm I'm dealing with a real, registered contractor.
Payment stages:
30% Upfront: paid when we sign the service agreement, so I can start your project.
30% Progress payment: due when we reach the milestone we agreed on.
40% Final payment: due when the work is complete.
Every price here is an estimated range in US dollars. The final quote depends on drawing size, the number of sheets and how complex they are. Wood-frame houses and rebar (BBS) have their own tables above.
Latest Updates
Structural Estimation Layout Sample
These samples show how I organise quantities into BOQ and takeoff schedules. Read each one together with the drawing scope and assumptions written next to it.




Complete BOQ Sample — G+3 Residential Building
Here's the same G+3 residential project in several measurement and classification formats, plus one separate US wood-frame house (CSI-2). The quantities are the same, only the layout changes. On a real project, we'd agree on the format first.
Got a BOQ template or measurement standard you prefer? Send it with the project documents and we'll settle the output format before I start measuring.
Scope of these samples: I measured general requirements (Div. 01), concrete, masonry, metals, waterproofing, openings and finishes (Div. 03–05, 07–09), plus earthwork and external works (Div. 31–33), straight from the drawings. Furnishings, plumbing and electrical are provisional items. Lifts, HVAC, fire protection, communications and security are out unless you send drawings for them. Wood framing (Div. 06) is in the separate CSI-2 wood-frame sample. Send me your drawings and I'll stretch the scope to fit your specification.


| Item No | Description of Works | Unit | Quantity | Deductions / Notes |
|---|---|---|---|---|
| 1.1 | C-25 Structural Concrete for Foundation Footings | m³ | 45.80 | Net volume excluding rebar displacement |
| 1.2 | 20cm Thick Solid Concrete Block (HCB) Masonry | m² | 185.20 | Door and window structural openings deducted |
| 1.3 | Sieved Sand Plaster (Fino Finish) to Interior Walls | m² | 370.40 | Applied 2 coats over smooth backing plaster |
| 1.4 | Exterior Weather-Resistant Facade Paint Work | m² | 4,437.00 | Calculated from exterior scaffolding drops |
Contact & Request a Project Quote
Email: belayamba1984@gmail.com
Location: Addis Ababa, Ethiopia
Time zone: East Africa Time (GMT+3)
Response time: I reply to every inquiry within 24 hours.
Confidentiality: Your drawings stay private. I'm happy to sign an NDA before you send them.
References: Professional references are available on request.
5D BIM & PlanSwift Technical Outputs
This gallery has some of my takeoff layouts, Bar Bending Schedules (BBS), PlanSwift workflows and BIM-related quantity outputs. They show how I present results and how I work. What you actually get will depend on the drawings and model information you send.
1. 5D BIM & QS Suite (Market Rates Dashboard)
2. PlanSwift Footing & Strap Takeoff Analysis (Metric)
3. Footing Takeoff & Structural Layout Breakdown (Imperial)
4. Circular Pile Foundation Takeoff & Global BOQ (Metric)
5. Pile Foundation Takeoff & Excavation Breakdown (Imperial)
6. Column Reinforcement Takeoff & Drawing Mapping (Metric)
7. Structural Column Takeoff Summary (Imperial)
8. Automated Bar Bending Schedule (BBS) Dashboard
9. Blockwork & Masonry Quantity Survey Breakdown
10. Substructure Setting Out & Earthwork Takeoff Tree







